Artson Engineering was incorporated in the year 1978 and since inception, the Company has commissioned, on turnkey basis, several fuel storage and handling facility systems. The Company is operating in one segment viz.Supply of equipment, steel structure
2009
Artson Engineering has received an Order from HPCL - Mittal Energy Ltd for construction of Intermediate and Product Storage Tanks work for Guru Gobind Singh Refinery Project at Bhatinda, Punjab. The estimated contact value of the order is Rs 191.70 Crore.
2009
2010
The Company has received an Order from Overseas AST Co. LLC, Dubai for construction of fuel storage facilities at 3 (three) locations on the outskirts of Abu Dhabi at (a) Al Hamra Military Airport (b) Safran Air Base and (c) Al Dhafra Air Base of UAE Armed Forces.
Artson Engineering has received an Order from Cairn Energy India PTY Ltd. (CAIRN) worth Rs. 25 Crore
Artson Engineering has received an Order from Petrofac International Limited, Sharjah, UAE
2010
2011
Registered Office of the Company has been shifted From Rang Udyan, Building No. 1, 2nd Floor, Sitladevi Temple Road, Mahim (West), Mumbai - 400 001 To Rang Udyan, Building No. 2, 1st Floor, Sitladevi Temple Road, Mahim (West), Mumbai - 400 016.
Artson Engineering was awarded a contract Cairn Energy India Pty Limited worth Rs. 32 Crore.
Artson Engineering has received an EPC contract awarded, by Nagarjuna Oil Corporation Ltd.
Artson Engineering has received a Work Order from Tata Steel Growth Shop, a division of Tata Steel Limited worth Rs. 20.65 Crore
2011
2012
Artson Engineering Receives Work Order of Rs. 19.90 Crore
Artson Engineering's Nashik Manufacturing Unit has received an Order from Tata Projects Limited worth Rs. 12.47 Crore.
The Company has received a contract entailing Engineering, Procurement and Construction of 21 (Twenty One) tanks, Piping, Equipment erection and Painting for Liquid Tank Terminal establishment at Haldia. The estimated contract price is Rs. 23.81 Crore.
Artson Engineering has received a Letter of Intent for a project entailing Piping Shop Fabrication Works to be executed in United Arab Emirates (UAE). The estimated contract price is Rs. 9.12 Crore.
2012
2013
Artson Engineering Ltd commenced commercial activities at the manufacturing facility at Umred.
Artson Engineering Ltd received a Letter of Intent (LoI) for fabrication, assembly, shop testing, inspection, painting, supply and transportation of various building structures estimated contract price is Rs. 56.37 Crore.
Artson Engineering Ltd received has received a Work Order from Tata Steel Growth Shop, a division of Tata Steel Limited. The Company's scope of works includes structural fabrication works at Gamharia (near Jamshedpur) and the estimated work order value is 42.06 Crore.
Artson Engineering Ltd Nashik Manufacturing Unit has received an Order entailing design, engineering, manufacturing, supply, testing and commissioning of Buffer Vessels for a project at Kalinganagar, Odisha. The estimated contract price is Rs. 20.26 Crore.
The Registered Office of the Company has been shifted from Rang Udyan, Building No. 2, 1st Floor, Sitladevi Temple Road, Mahim (West), Mumbai - 400016 to 11th Floor, Hiranandani Knowledge Park, Technology Street, Powai, Mumbai - 400076.
2013
2014
Artson Engineering Ltd received a Letter of Award (LOA) from Cairn India Limited.
Artson Engineering Ltd received a Letter of Intent (LoI) for Fabrication and Painting of chemical storage tanks at Sharjah, UAE. estimated contract price is AED 6.2 Million (approx. Rs. 10.70 Crore).
2014
2016
Company has received a Letter of Award from Mumbai Aviation Fuel Farm Facility Pvt. Ltd., (MAFFFPL) at a total price of INR 24.43 Crores for Design, Fabrication, Erection and Testing of 5 Nos. Fixed Cone Roof Storage Tanks.
Artson Engineering bags Rs 108 cr contract from Odisha.
2016
2017
Artson Engineering gets order worth Rs 5.19 cr.
AEL bags Rs 5.20 cr order from Tata Projects.
2017
2019
Artson Engineering bags order of Rs. 25.79 crores from BHEL.